On July 28th 2018, The Pavillion built for the swimming pool was commissioned.
GOGA pledged to build a swimming pool in 2005 to be used by the two schools. Funds were raised and The swimming pool was built in 2006. The Swimming Pool has been in use since 2007 by both schools.